Impact of weather conditions on labours’ productivity in the Nigerians’ construction industry Academic Article uri icon

abstract

  • Weather is almost inevitable and plays an important role in determining the duration of construction projects. The construction industry ultimately thrives upon the physical input, put in by the labours. The majority of the construction projects are executed in the outdoor environment and hence face a high impact of weather conditions. This study therefore evaluated the influence of weather conditions on construction workers’ productivity in Jos, Plateau State and proceeded to make recommendations geared towards the improvement of construction workers’ productivity in Jos. The study was conducted through the direct observation method. Three hundred and ninety-six (396) works were purposively sampled in selected working sites. The outcome shows that during dry weather, there was considerably less significant productivity of manual excavation. In contrast, a large increase in blockwork and plasterwork productivity was observed with a percentage difference of 33%, 56.3% and 61%, respectively. On the other hand, during wet weather conditions, the labour productivity for manual excavation increases, whereas it decreases for block work and plasterwork with percentages difference of 58%, 40% and 47%, respectively. Besides, relative humidity and wind speed have no impact on labours’ productivity in dry and wet weather. Besides, the temperature has the most decisive impact on workers’ productivity. Moreover, wind speed and humidity have a lower influence on workers’ productivity. The construction industry stakeholder in Jos, Nigeria, would benefit from this study’s recommendations for reducing the influence of weather on the building sector. Besides, the output can be extended to other regions having similar characteristics.

publication date

  • 2024

start page

  • 4429

volume

  • 8

issue

  • 13